
Hydrocarbon Dew Point and Humidity Analysis at the Gibraltar Gas Plant
- Industry
- Oil & Gas
- Location
- Gibraltar - Colombia
- Year
- 2016
The challenge
To inject gas safely into the pipeline, the Gibraltar plant must show at its custody transfer point that the gas meets technical specifications.
The solution
Continuously measure hydrocarbon dew point and humidity at the custody transfer point to ensure that natural gas meets the technical specifications required for safe injection into the pipeline.
Value to the client
Ensures that the gas meets the requirements for safe injection into the pipeline, protecting the infrastructure and ensuring reliable transactions.
Do you have a similar project?
Tell us about your process and we'll reply with a proposal.


